Ion wind stick, ion wind stick manufacturer, ion wind stick price, ion wind snake-Stick Technology (Guangdong) Co., Ltd.

Service Hotline:
13509222289
Ask For A Quick Quote
You will get reply in 2 hours
Home > Common problem Stainless steel bottom box rectifying ionic air

Stainless steel bottom box rectifying ionic air

2021-12-02 16:58 Ion fan|Ion wind copper rod|Ion wind snake Read 899

Q: stainless steel bottom box rectifying ion wind snake mouth how to maintain

A:

First, the requirements of power supply and air source


1, the power supply must have ground, and to ensure full grounding, transformer must ensure good grounding, before each use to check


Check that the ground wire knob is tightened. Ionic air nozzle is a high voltage energized product, so each energized working time can not exceed the maximum


16 hours. Otherwise: high pressure leads to high voltage wire, air nozzle head heating, ion needle and grounding wire ignition, resulting in plastic


The cellular coke loss is gradually formed in the glue parts, and the removal of ions is gradually reduced, even causing security risks.


2. All air sources must be effectively filtered. Sometimes a secondary filter is required. The screening program should be cleaned in time.


Otherwise: water, oil and dust/dust particles will enter the ion generation chamber and adhere to the inner wall of the plastic parts. Accumulated to a


To a certain degree, the ion needle will ignite it. Results Cellular coke loss was gradually formed in plastic parts, resulting in ion excretion


Also gradually reduce, affect the effect of removing electricity, especially the safety risks, and even ignition.


Two, in addition to static effect adjustment


1, in addition to electrostatic effect in addition to electrostatic time and air pressure is inversely proportional. Pressure should be 0.2Mpa-0.5mpa.


2. The distance and Angle between the nozzle and the electrostatic field affect the electrostatic effect, so attention should be paid to debugging until satisfactory.


Three, daily maintenance


1. The head of the air nozzle is easy to break. Pay attention to prevent collision when using the air nozzle and prevent falling after use. Even if the fixed installation of the air nozzle, also


Take care to prevent object collisions.


2, to regularly check the high voltage wire jacket is not damaged, if there is damage should be immediately cut off the power supply, to avoid burning off, cause severe


Heavy consequences.


3, do not use the water to wipe the wind snake head, and the wind mouth, so as to avoid corrosion of plastic parts, and further affect the ion balance.


4. Dip in anhydrous industrial alcohol with a dust-free cloth to gently remove dust on the shell of the ionic air nozzle, at least once a week


5. Keeping the air nozzle clean can not only achieve better results, but also prolong the life of the air nozzle.


Instructions for operation:


1, the power supply joint should be checked once a month, to prevent the joint in the use of high voltage water vapor is easy to cause oxidation,


It needs to be cleaned regularly with industrial alcohol.


 

          image.png

 

2. During the use of ionic air nozzle, how to clean the tip of ion air nozzle when there is dust or debris

 Four, to inform


1. High-voltage ion air nozzle is a precise and sensitive electrostatic removal product. Under the conditions of its use, the amount of use time can be achieved


10,000 to 15,000 hours.


2, all high voltage in addition to static equipment, in the use of work, to often check whether the product has reached the static function, there


There is no abnormal situation. If certain products are found to be abnormal, exit the working area in time and contact the supplier to solve the problem.



Sales Manager: Huang Dezhong 13509222289

Business Department: Wang Danjing: 13790228779 13713227588

After-sales service telephone: 0769-82582071

Telephone: 0769-89791117/82582071 Transmission: 0769-85960809

Address: 2nd Floor, No. 1, Xintang Gukeng Yunhe West Road, Houjie Town, Dongguan City, 

Guangdong Province (Headquarters)

Sidike Product R&d Center: Network technical support, Building 5 sidike Building, Huateng 

High-tech City, Daliang Wusha Industrial Zone, Shunde, Guangdong Province

Copyright © 2002-2015 思帝克科技(广东)有限公司  版权所有   备案号: 粤ICP备2021028066号 

Scan for WeChat